PrimeRail培训 |
培.养.对.象 |
1.理工科背景,有志于数字集成电路设计工作的学生和转行人员;
2.需要充电,提升技术水平和熟悉设计流程的在职人员;
3.集成电路设计企业的员工内训。
|
入.学.要.求 |
学员学习本课程应具备下列基础知识:
◆电路系统的基本概念。 |
班.级.规.模.及.环.境 |
为了保证培训效果,增加互动环节,我们坚持小班授课,每期报名人数限5人,多余人员安排到下一期进行。 |
上课时间和地点 |
上课地点:【上海】:同济大学(沪西)/新城金郡商务楼(11号线白银路站) 【深圳分部】:深圳大学成教院/ 电影大厦(地铁一号线大剧院站)【北京分部】:福鑫大楼/北京中山 【武汉分部】:佳源大厦(高新二路) 【南京分部】:金港大厦(和燕路)
【成都分部】:领馆区1号(中和大道)
最近开课时间(连续班/周末班/晚班): PrimeRail培训开班时间:即将开课,详情请咨询客服。(请抓紧报名) |
实验设备 |
◆课时: 共6天,36学时
☆合格学员免费颁发相关资格证书,提升您的职业资质
作为最早专注于嵌入式培训的专业机构,曙海嵌入式提供的证书得到本行业的广泛认
可,学员的能力得到大家的认同。
☆合格学员免费推荐工作
★实验设备请点击这儿查看★ |
.最.新.优.惠. |
◆在读学生凭学生证,可优惠500元。 |
.质.量.保.障. |
1、培训过程中,如有部分内容理解不透或消化不好,可免费在以后培训班中重听;
2、课程完成后,授课老师留给学员手机和Email,保障培训效果,免费提供半年的技术支持。
3、培训合格学员可享受免费推荐就业机会。 |
PrimeRail培训 |
第一阶段 |
ObjectivesAt the end of this workshop the student should be able to:
- Set up and perform Power/Ground (PG) reliability analysis for checking Static and Dynamic Voltage Drop and Electromigration (EM) potential violations
- Explanation of and/or set up the phases of Dynamic analysis of PrimeRail that involve the following:
- Library Characterization
- Data preparation
- Power Analysis
- PG Parasitic (RC) Extraction
- Dynamic (Transient) Rail Analysis
- Violation Viewing, Reporting and Correction
- What-if Analysis ? Package parasitics and Decap insertion
- Voltage Drop Derated Timing Analysis
- Accurate Hard Macro Modeling
- Power Management( power switch) Cell handling
- Set up PG analysis for hierarchical and top-level
- Use the PrimeRail graphical user interface (GUI) for the PG rail analysis, including what-if analysis
Audience Profile
Design, verification or CAD engineers who perform power/ground interconnect reliability analysis at the "Block" or "Full-Chip" levels. This covers a wide spectrum of designs of digital, memory, and analog/mixed signal.Prerequisites
Experience in the following areas is recommended to gain the most value from the workshop content:
- Physical layout
- Physical extraction
- Power simulation
|
Static Analysis
- Introduction to Rail Analysis - requirements, capabilities and database preparation
- Power and Timing Model creation
- Power supply, net switching and Transition Time inputs
- Power and Rail Analysis
- Mapping, reporting, querying and what-if Analysis
- Integrated Flows - Hardmacro modeling, Power gating and Voltage derated timing analysis
|
第二阶段 |
Dynamic ( Transient) Analysis
- Introduction, database requirements and flows
- Library Characterization and LSF
- Cell-Level Dynamic Analysis-PP Run
- Cell-Level Dynamic Analysis-Transient Analysis
- What-if Analysis ? Package Parasitics and Decap Insertion
- Mapping, waveform viewing, reporting and querying
- Tx-Level Dynamic Analysis-Data Preparation
- Tx-Level Dynamic Analysis
- Tx-Level Signal EM Analysis
- Macro Modeling - Memory, Analog, custom or Hardmacro blocks
|